Figure 74 Cables At Sides Of Lcd Panel That Get Trapped - FUTABA 9z User Manual

Hide thumbs Also See for 9z:
  • Faq (72 pages)
Table of Contents

Advertisement

FUTABA 9Z
V
3.
Re fit the LCD panel being very, very careful not to trap any cables (see Figure 74).
Warning: There are cables on each side that can become lodged over screw holes in
sides of the main cases body. Check for these as you will put a screw through the
middle of them if they are missed when you refit the sides.

Figure 74 Cables at sides of LCD Panel that get trapped

4.
Refit all upper case screws you removed in this stage but do not tighten them fully.
5.
Hold the case together checking the fit of parts. Also note that your joysticks may
have rotated slightly, if so rotate them back into place. Finally, once all is correct,
tighten the Allen key screws for the upper case panel.
WARNING: THE INFORMATION IN THIS MANUAL IS FOR INFORMATION PURPOSES ONLY AND MAY BE INCORRECT, CAUSE DAMAGE
TO YOUR RADIO OR INJURY TO YOURSELF AND OTHERS. IF YOU USE THIS MANUAL YOU DO SO SOLEY AT YOUR OWN RISK.
THE UNOFFICIAL WORKSHOP MANUAL
This completes Stage 4 reassembly
Page 72 of 84
www.jamesandtracy.co.uk
Copyright 2012 jamesandtracy.co.uk

Advertisement

Table of Contents
loading

Table of Contents