Alcove Installation - Thermo Pride GMD1-80N Installation And Service Manual

Gas-fired furnace models down flow & direct vent (sealed combustion)
Hide thumbs Also See for GMD1-80N:
Table of Contents

Advertisement

All installations and services must be performed by qualified service personnel.
?CAUTION: A permanent opening with a minimum of 50 square inches of
?
?
?
unobstructed infiltration (free area) for ventilation and combustion air must be
provided to the interior of the structure. Additional make-up air may need to be
supplied to the interior of the structure to compensate for exhaust fans,
appliances, or vents, which consume air from the interior of the structure.
Refer to the assembly installation instructions included with OM1COT-BASE cottage
base for additional information.
3. Coil Cabinet: CE111S
The CE111S coil cabinet (figure 1C) is for applications requiring air conditioning.
The coil cabinet is designed to have the combustion air brought in from the bottom
thru a duct, supplied with the cabinet. Refer to section G Combustion air of this
manual for further instructions on the combustion air termination and connections.
For additional information refer instructions provided with the CE111S coil cabinet.
E. ALCOVE INSTALLATION
In this application, a minimum of 18
inches of clearance must be provided
to the front of the unit. Refer to Figure
4.
Alcove installations must use the No.
70 mobile home base.
Refer to section
G. COMBUSTION AIR for additional
combustion air requirements.
Figure 4
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents