Reassigning A Slave Unit As The Master Unit; Replacing A Stacked Switch - Linksys SLM248G4S (G5) User Manual

Business series 24-port or 48-port 10/100 + 4-port 10/100/1000 gigabit resilient clustering smart switch with 2 combo sfps
Table of Contents

Advertisement

Chapter 
10.
Connect the cable's other end to port G2 on Unit 6.
11.
Connect one end of a Category 5e Ethernet network
cable to port G1 on Unit 6.
12.
Connect the cable's other end to port G2 on Unit 1.
For a stack with less than 6 switches, the steps are similar
except that port G1 of the last switch in the stack must be
connected back to port G2 of the frst switch in the stack.
The following is an example of setting up a stacked
configuration using three SLM248G4S switches.
1.
Connect port G1 on Unit 1 to port G2 on Unit 2.
Connect Unit 1 to Unit 2
2.
Connect port G1 on Unit 2 to port G2 on Unit 3.
Connect Unit 2 to Unit 3
3.
Connect port G1 on Unit 3 to port G2 on Unit 1.
Connect Unit 3 to Unit 1
24/48-Port 10/100 + 4-Port Ggabt Reslent Clusterng Smart Swtch wth 2 Combo SFPs
For detailed information on switch stacking, refer to
"Appendix B: About Switch Stacking. "
For more information on stack configuration using the
Console Interface, refer to "Stack Configuration" and
"System Mode" in "Chapter 4: Configuration Using the
Console Interface" .
For more information on stack configuration using the
Web-based Utility, refer to "Setup > Stack Management"
in "Chapter 5: Configuration Using the Web-based Utility".

Reassigning a Slave Unit as the Master Unit

You can reassign a slave unit so that it becomes the master
unit. To do this, you swap their unit numbers. For example,
to make slave unit 5 be the master, you change the master's
unit number from 1 to 5 and the slave's unit number from
5 to 1. To change the unit numbers, you can use either the
Web-based utility or the console interface.
The following describes the procedure for changing a
slave unit into the master unit. In this example, unit 5 is
made the master unit.
1.
Swap the unit numbers. That is, change the unit
number of the current master from 1 to 5, and change
the unit number of slave unit 5 from 5 to 1. (The order
in which these are performed is not significant.)
2.
Power off the new unit 5 (the former master unit).
3.
Power off the new master unit 1 (the former slave unit
5) briefly, then power it on again.
4.
Power up the new unit 5.
NOTE:
If unit 2 (the backup master) is made the
master unit, steps 2 through 4 can be skipped.

Replacing a Stacked Switch

To replace one switch in a stack with another switch
without having to reboot or power down the stack:
1.
Run the Web-based utility.
2.
Go to the Setup > Stack Configuration screen.
Make sure that the Stackng Ports After Reset setting
3.
matches the type of stacking ports (Copper Ports or
Combo Ports) that are used to connect the switches.
Verify that the Unt No. After Reset settings specify the
4.
correct unit number for the switch being replaced.
5.
Click Save Settngs to save the stack settings.
6.
Disconnect the switch being replaced, then connect
the new switch using the same stacking ports (copper
or combo) as before.
The stack should continue to operate as before.
Installation


Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slm224g4s g5Slm224g4sSlm248g4s

Table of Contents