HCD-HPZ7/HPZ9
QQ
3 7 63 1515 0
1-33. LEVER (LOADING R, LOADING L)
TE
L 13942296513
6 lever (loading R),
gear (IDL-G),
gear (IDL-H)
www
.
26
http://www.xiaoyu163.com
2
SPR-T (loading L)
5 two hooks
PRECAUTION DURING LEVER (LOADING R/L) INSTALLATION
Align the horizontal position.
x
ao
y
lever (loading L)
i
Install the both levers so that they move symmetrically.
http://www.xiaoyu163.com
8
1
SPR-T (loading R)
Q Q
3
6 7
1 3
3 two hooks
u163
lever (loading R)
.
2 9
9 4
2 8
1 5
0 5
8
2 9
9 4
4 lever (loading L)
m
co
9 9
2 8
9 9