Baxi Main Combi 24 HE Installation And Service Instructions Manual page 28

Hide thumbs Also See for Main Combi 24 HE:
Table of Contents

Advertisement

Suggested Lifting Points
shown as shaded area
Pressure Relief Valve
Discharge Pipe
28
© Baxi Heating UK Ltd 2011
Fig. 33
Wall Plate
1. Remove the sealing caps from the boiler connections.
Sealing
2. Lift the boiler as indicated by the shaded areas. The
Washers
boiler should be lifted by TWO PEOPLE. Engage the slots
at the top rear of the boiler on the wall plate (Fig. 35)
(see Safe Manual Handling page 5).
3. Insert the sealing washers between the valves and
pipes on the wall plate and the boiler connections.
Fig. 32
4. Tighten all the connections.
Remove Sealing Caps
from under the Boiler
1. Remove the discharge pipe from the kit.
2. Determine the routing of the discharge pipe in the
vicinity of the boiler. Make up as much of the pipework as
is practical, including the discharge pipe supplied.
3. The pipework must be at least 15mm diameter and
run continuously downwards to a discharge point outside
the building. See section 6.7 for further details.
4. Utilising one of the sealing washers, connect the
discharge pipe to the adaptor and tighten the nut.
5. Complete the discharge pipework and route it to the
outside discharge point.
10.0 Installation
10.4
Fitting The Boiler
NOTE: A small amount of water may drain from the
boiler once the caps are removed.
10.5
Fitting the Safety Pressure Relief
Discharge Pipe (Fig. 33)
IMPORTANT: Make all soldered joints before
connecting to the safety pressure relief valve.