General Access And Emptying Hydraulic Circuits; Nomenclature; Case Panels; Control Panel - Biasi Activ A 12OV Service Manual

Wall hung, fan flue, room sealed, high efficiency gas boiler
Hide thumbs Also See for Activ A 12OV:
Table of Contents

Advertisement

2
General access and emptying
hydraulic circuits
2.1

Nomenclature

5
4
Fig. 2.1
1
Right side panel
2
Main electronic p.c.b. box
3
Front panel
4

Control panel

5
Left side panel
2.2

Case panels

Warning: isolate the boiler from the mains
electricity supply before removing any
covering or component.
For the most part of the check and maintenance oper-
ations it is necessary to remove one or more panels of
the case.
The side panels can be removed only after the removal
of the front panel.
To remove the front panel loosen screws A (Fig. 2.2).
B
Fig. 2.2 --- bottom view of the boiler
Pull the lower part of the front panel and lift it upwards
(Fig. 2.3).
2
1
2
3
A
B
C
C
Fig. 2.3
To remove the side panels loosen the screws B
(Fig. 2.2) and C (Fig. 2.3).
Pull the side panels towards the outside.
To Fit the case panels
Fit the side case panels
Warning:
Fit the front panel hooking it on the upper side.
Push the front case panel until it is completely hold in
place (Fig. 2.4).
Ensure that the front panel edge is close---fitting to the
side panels.
Lock in place the panel with the appropriate screws.
Fig. 2.4
2.3
Control panel
Warning: isolate the boiler from the mains
electricity supply before removing any
covering or component.
To gain access to the parts located inside the control
panel proceed as follows:
1
Remove the front panel of the case.
Unscrew the screw D (Fig. 2.5)