Gas Valve; Function; Description Of The Parts; Adjustment - Biasi Activ A 12OV Service Manual

Wall hung, fan flue, room sealed, high efficiency gas boiler
Hide thumbs Also See for Activ A 12OV:
Table of Contents

Advertisement

8

Gas valve

8.1

Function

The Gas valve A in Fig. 8.1 controls the gas inflow to the
boiler burner.
A
Fig. 8.1
By means of an electric command given to the on---off
operators the passage of the gas through the Gas valve
can be opened or closed.
8.2
Description of the parts (Fig. 8.2)
5
Fig. 8.2
1
Maximum gas pressure adjustment
2
Minimum gas pressure adjustment
3
On---off operators
4
On---off operators electric connector
5
Gas valve inlet pressure test point
8.3

Adjustment

Warning: isolate the boiler from the mains
electricity
covering or component.
Check the supply pressure before making any ad-
justment to the gas valve.
1
Close the gas inlet valve.
2
Remove the front panel of the case and lower the
control panel (see sections 2.2 and 2.3).
3
Loosen the internal screw on the Inlet Pressure
Test Point 5 (Fig. 8.2) of the Gas valve and con-
nect a pressure gauge using a suitable hose.
4
Open the gas inlet valve.
5
Turn on the electricity supply to the boiler, switch-
ing on the fused spur isolation switch.
6
Set the boiler in c.h. function as illustrated in
Fig. 8.3
Fig. 8.3
7
Make sure that the room thermostat is in the "heat
request" position.
8
Read the inlet pressure value and ensure that it is
within the limits given in the table Gas supply
pressures, of the user/installation manual
If it does not comply with the required pressure
1
check the gas supply line and governor for faults
and/or correct adjustment.
2
9
Switch off the boiler close the gas inlet valve.
10
Disconnect the pressure gauge and close the
Inlet Pressure Test Point 5 (Fig. 8.2).
Gas valve adjustment
3
The person carrying out a combustion
measurement should have been assessed as
competent in the use of a flue gas analyser
and the interpretation of the results.
4
The flue gas analyser used should be one
meeting the requirements of BS7927 or
BS-- EN50379-- 3 and be calibrated in
accordance with the analyser manufacturers'
requirements, and have a current calibration
certificate.
11
Fit the probe of the flue analyser in the flue ex-
haust sampling point located on the exhaust
pipes of the boiler (Fig. 8.4).
supply
before
removing
C.h.
function
any
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Activ a 20ovActiv a 15ovActiv a 25ov

Table of Contents