CS300 BOILER INSTALLATION AND OPERATION INSTRUCTIONS
The jacket should be assembled using the black screws
provided. On 5 through 12 section models slide the rear
panel behind the draft hood flanges with the grill side on
the floor, Figures 58, 59 & 60.
Figures 58
Rear Panel Installation, 5 through 12
Figures 59
Rear Panel Installation, 5 through 12
Figures 60
Rear Jacket Panel Installation Detail
Fasten the rear jacket panel to the inner draft hood and
flue collector flanges using the holes provided, Figure
61.
Figures 61
Remove the left and right jacket side panels from Box
55175, Jacket Side Panels. Remove the knockouts
necessary to attach the steam piping and controls.
NOTE: All jacket panel joints must be made so the
panels are metal to metal. The insulation on the edges
of the front, top and rear panels must be pushed
behind the side panel flanges before fastening the
panel together, Figure 62.
Figure 62
Page 25
Rear Panel Installation
Jacket Insulation Detail