HydroTherm CS300 Installation And Operating Manual page 13

Natural or propane gas boiler
Table of Contents

Advertisement

CS300 BOILER INSTALLATION AND OPERATION INSTRUCTIONS
Temporarily attach the manifold brackets and manifold,
Figures 11 and 12.
Figure 10
Figure 11
Manifold Bracket Attachment
Figure 12
Plumbing Base
Manifold Attachments
Locate the Burner Box. It is marked with a number from
72724 to 72731. Install three burner tubes in the base,
one on each end and one in the middle. Slide the closed
end of the burner tube through the slot in the burner base
rear panel. The notch in the burner must engage the
burner base rear panel, Figure 13.
Figure 13
Notch
Notch
Engaged
Adjust the manifold and base so the burner tube orifice
bracket is approximately in the middle of the orifice on
all three burners, Figure 14.
Figure 14
Burner Tube Installation
Burner Tube Adjustment
Page 13

Advertisement

Table of Contents
loading

Table of Contents