Burnham Series 5B Installation, Operating And Service Instructions page 12

Burnham series 5b gas-fired boiler
Hide thumbs Also See for Series 5B:
Table of Contents

Advertisement

SecTiON iii – iNSTALLATiON iNSTRUcTiONS (continued)
leh secTion on base
12
dual manifold bases - 5015b Thru 5026b secTion boilers
fiG. 4
fiG. 3
Center Sections on 11 section and larger boilers. THIS
IS IMPORTANT.
a. Carefully join a Center Section with nipples in
adjoining section and bump lightly to secure.
b. Run nut approximately 8" on two (2) ¾" draw-up
rods of equal length. (Note – more than one set of
draw-up rods are furnished on 8 section and larger
boilers). Place draw-up channel and one flat washer
against nut.
assembly of cenTer secTions
fiG. 5

Advertisement

Table of Contents
loading

Table of Contents