Baxi Sirius FS 90-105-130-160 Installation, Operation & Maintenance Manual page 26

Baxi sirius fs 90-105-130-160 floor standing condensing gas boilers
Table of Contents

Advertisement

12.4 description oF the electrical connections to the boiler
Turn the control box downward to access terminal blocks M1 and M2 used for the electrical connections by
removing the two protective covers (see figure 10).
Terminals 1-2: connections for the optional SIEMENS QAA73 (optional extra) room temperature regulator.
These connections do not have any specific polarity.
Remove the bridge between terminals 1-2 "TA" on terminal
block
M1.
Read the instructions provided with the temperature regulator to ensure correct installation and program-
ming.
Terminals 3-4: room temperature thermostat "TA". Thermostats with integral accelerator resistor must not be
used. Check that there is no voltage across the ends of the two thermostat connection wires.
Terminals 5-6: external safety contact (commercially available device).
Terminals 7-8: connections for the optional SIEMENS QAC34 outdoor temperature sensor supplied with the
boiler. Read the instructions provided with the outdoor temperature sensor to ensure correct installation.
Terminals 9-10: connections for the optional domestic hot water priority sensor, for connecting single system
boilers to external DHW boilers.
cLIp-In aGu 2.511
terminals 3-4 L-n out: connection to signal lamp (230 V - 0,5 A max) for lockout alarm.
terminals 5-6 L-n out: connection to signal lamp (230 V - 0,5 A max) for run mode.
For low voltage signal lamp remove the internal wiring and feed with an external low voltage power supply.
12.5 connecting the qaa73 rooM teMperature regulator
The SIEMENS model QAA73 room temperature regulator, if required (optional accessory) must be connected
to terminals 1-2 of terminal block M2 in figure 12.
The link across terminals 3-4, provided for connection of a room temperature thermostat, must be removed.
The settings of the domestic hot water temperature and domestic hot water production schedule must be made
using this device.
The timed program of the central heating circuit must be set on the QAA73 if there is a single zone, or in relation
to the zone controlled by the QAA73 device.
The timed program for the central heating circuit of the other zones can be set directly on the boiler control
panel.
See the instructions provided with the QAA73 temperature regulator for the user parameter programming
procedure.
QAA73: parameters which can be set by the installer (service)
By pressing the two PROG buttons together for at least three seconds it is possible to access the list of para-
meters that the installer can display and/or set.
Press either of these buttons to change the parameter to display or change.
Press the [+] or [-] key to change the value displayed.
Press either of the PROG buttons again to save the change.
Press the information button (i) to quit programming.
Here follows a list of the most commonly used parameters:
InstructIons pertaInInG to the InstaLLer
912.823.1 - GB
26

Advertisement

Table of Contents
loading