Existing Fireplace Preparation - Pacific energy BROADWAY Installation And Operating Instructions Manual

Series: a direct vent gas insert
Table of Contents

Advertisement

 
INSTALLER
 
INFORMATION
 
The Broadway and Brentwood Gas inserts are certified to be installed into pre-existing approved
fire place cavities. The minimum cavity requirements are listed in Figure 14 below.
 
Dimension   Broadway  
A  
 
B  
 
C  
 
Before installing the Broadway or Brentwood inserts have the chimney swept and fireplace,
including ash dumps and clean outs, cleaned to remove any creosote and soot residue that
may cause odors and stains after the insert has been installed. The fireplace chimney should
be in good working order and made of non-combustible material. Make sure chimney cleanouts
fit properly.
When preparing an existing fireplace to install a gas insert, any modifications that will
compromis
venting the fireplace flue dampener may be blocked open or removed. Refractory, glass doors,
screen rails, screen mesh and log grates can be removed from the fireplace before installing
the insert. Also, smoke shelves, shields and baffles may be removed if attached by mechanical
fasteners. Cutting any sheet metal parts of the fireplace, in which the gas fireplace insert is to
be installed, is prohibited.
If the factory-
(37.5mm) or less may be drilled through the lower sides or bottom of the firebox in a proper
workmanship like manner. This access hole must be plugged with non-combustible insulation
after the gas supply line has been installed.
 
 

Existing Fireplace Preparation

 
Brentwood  
 
 
 
Figure 14: Cavity Dimensions
16  

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brentwood

Table of Contents