LG LP-10091CL/XL Service Manual page 36

Package air conditioner
Table of Contents

Advertisement

1) Re-air purging
(Re-installation)
Indoor unit
Gas cylinder
R22
• Procedure
Confirm that both the 3-way (liquid side) valve and
the 3-way(gas side) valve are set to the closed
position.
Connect the charge set and a gas cylinder to the
service port of the 3-way(gas side) valve.
• Leave the valve on the gas cylinder closed.
Air purging.
• Open the valves on the gas cylinder and the charge
set. Purge the air by loosening the flare nut on the
3-way(liquid side) valve approximately 45° for 3
seconds then closing it for 1 minute; repeat 3 times.
• After purging the air, use a torque wrench to tighten
the flare nut on liquid side valve.
Check gas leakage.
• Check the flare connections for gas leakage.
Liquid side
Gas side
OPEN
CLOSE
Closed
3-Way
valve
Closed
3-Way
valve
Discharge the refrigerant.
• Close the valve on the gas cylinder and discharge
the refrigerant until the gauge indicates 3 to
5kg/cm
g
2
Disconnect the charge set and the gas cylinder,
and set the 3-way(liquid side) and 3-way(gas side)
valves to the open position.
• Be sure to use a hexagonal wrench to operate the
valve stems.
Mount the valve stem nuts and the service port nut.
• Use torque wrench to tighten the service port nut.
• Be sure to check gas leakage.
– 36 –
Outdoor unit

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lp-15091cl/xlLp-20091cl/xl

Table of Contents