Step 4
Step 5
Anchor Bolts,
Nuts and Washers
(Part of Andrew 302689)
Foundation
Note: Jacks are not
installed until after the
pedestal is securely
attached to the foundation.
208366
Az/El Jack
Assembly
Anchor Bolts,
Nuts and Washers
(Part of Andrew 302689)
Foundation
Level the pedestal plumb within ±0.5° using the leveling nuts provided.
Secure pedestal with washer and nuts as shown in Figure 17.
Hex Nut
(9999-182)
Flat Washer
(9997-229)
302677
Pedestal Assembly
Figure 17 (Manual Mount)
303158
Pedestal Assembly
Figure 17A (Motorized Mount)
26
Level Pedestal
Plumb Within ±0.5°
Optional: Fill Cavity With
Non-Shrinking Grout
Split PVC Drain Required
if Cavity is Grouted
Reference Drawing 240299
Level Pedestal
Plumb Within ±0.5°
Optional: Fill Cavity With
Non-Shrinking Grout
Split PVC Drain Required
if Cavity is Grouted
Reference Drawing 240349
Installation Procedures