Step 3
Reference Drawing 240299
6 Ft. Choker
Pedestal Assembly
(302677)
Manual Mount Shown
To Foundation Pad
Refer to Figure 16. Using the 6 foot nylon choker under the stinger arm, and the 3 foot chok-
er around the elevation pivot tube, lower the pedestal into position over the anchor bolts.
Note: Hex nuts and flatwashers supplied with 302689 anchor bolt kit.
3 Ft. Choker
Reference Drawing 240349
Figure 16
3 Ft. Choker
TOP VIEW
6 Ft. Choker
3 Ft. Choker
6 Ft. Choker
Pedestal Assembly
(303158)
To Foundation Pad
25
3 Ft. Choker
Note: Jacks are not
installed until after the
pedestal is securely
attached to the foundation.
Motorized Mount Shown
Installation Procedures