Majestic 400DVBL Installation And Operating Instructions Manual page 39

Dvbl series direct vent gas fireplace
Table of Contents

Advertisement

OPTIONAL FAN BLOWER SYSTEM
Engine
Cutout
Figure 55 -
Insert Blowers through
Engine Cutout
KT504
install blower
15. Plug the AC box plug to the junction box.
16. To test blower operation. Turn the fireplace
11/08
on. Turn blower on. The blower should turn on
within five (5) minutes. Refer to the operating
instructions on Signature Command remote
control for complete operation instructions.
Finishing
Re-install the lower access panel.
NOTE: Some older units are not equipped with
mounting brackets. Velcro and magnets are used
to mount blowers to sidewall and floor.
74D0010
KT504
AC Box
Connector Hole
Figure 57 - Connect AC Box to Control Box
Figure 56 -
Blower Installation Position
KT505
KT505
Screw
install blower
Control Box
FP1916
AC box
8/08
DVBL Series Gas Fireplace
Start Position
Installed
Position
Connector Pin
Guiding Block
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

500dvbl

Table of Contents