Installation - APW Wyott AT/BT Series Installation And Operating Instructions Manual

Apw/wyott diagonal contact/ radiant conveyor toaster installation and operating instructions
Table of Contents

Advertisement

C. INSTALLATION
1.
Place the toaster on a flat surface and in such a way that the unit's vents are not blocked. Air
must circulate under and through vent provided on the base, left side and at the rear of the
unit. A minimum clearance of one inch (1", 2.6 cm) is required on the base and two inches
(2", 5.2 cm) on the left side and rear of unit. Overhead clearance should allow heat to be
dispelled adequately.
2.
Locate the unit near a wall receptacle of the proper configuration. DO NOT USE AN
EXTENSION CORD. Plug the power supply cord into an outlet of the voltage specified on
the unit's rating label plate. Outlets must be grounded properly.
To convert an AT Toaster from front return to rear exit, follow steps indicated in Figures 1 to 3.
Figure 1:
1.
Turn off unit and let cool.
2.
Remove Breadslide through
front of unit.
3.
Extra line if needed.
Figure 2:
1.
Flip Breadslide over.
2.
Insert Breadslide through back
opening.
3.
Place on conveyor belt.
Figure 3:
1.
Turn on unit.
2.
Conveyor belt will move
Breadslide to rest on locator
pins.
3.
Ready to operate in rear exit
mode.
CONVERTIBLE AT SERIES TOASTER
FIGURE 1
FIGURE 2
FIGURE 2
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents