External Battery Connection - GE Digital Energy LP 33 Operating Manual

10 – 20 – 30 kva series 4
Hide thumbs Also See for Digital Energy LP 33:
Table of Contents

Advertisement

g
4.8.3

External battery connection

Before proceeding to an external battery connection, follow the Safety rules concerning the
battery.
Make sure that the UPS is not powered, and remove the external battery protections and the fuses
F9, F10, F11 at the front of the UPS cabinet.
ATTENTION !
Before closing the battery fuses F9, F10 and F11, verify for correct polarity of
the battery connection.
+
F9 (+) = Positive pole
NOTE !
Clamp the input/output cables with the included cable-ties "A".
OPM_LPS_33E_10K_30K_4CN_V010.doc
-
+
0
-
0
F10 (0) = Central point of battery blocks
Fig. 4.8.3-1 External battery connection to UPS
-
+
0
Operating Manual LP 33 / 10-20-30 kVA
32/82
GE
F11 (-) = Negative pole