Plumbing Confi Guration; Function; Flowmeter - American Water Heater SRCC OG-300 Instruction Manual

Residential solar water heating systems
Table of Contents

Advertisement

Installing the ½" copper to and from the collector using
the compression fittings.
1. Push the union nut
2. Insert the support sleeve
3. Insert the copper pipe with the
4. First screw the union nut
5. Tighten the union nut
Figure 24.
PLUMBING CONFIGURATION
1
2
3
4
Figure 25.
the cutting ring
onto the
copper pipe
. The pipe
must protrude at least 3/8"
(3 mm) from the cutting ring
in order to ensure the force
transmission and the sealing.
the copper pipe.
plugged-on individual parts (
and
) all the way into the
housing of the compression
fitting
.
manually.
rotating one full turn. Hold the
housing of the compression
fitting
to avoid rotation in order
to avoid damaging the sealing
ring.
1.
½" copper tube - from
the collector outlet
(top) to the collector
return compression
fitting.
2.
½ " c o p p e r t u b e –
from the collector
i n l e t ( b o t t o m ) t o
the collector supply
compression fitting.
3.
¾ " c o p p e r t u b e –
from the upper tank
inlet marked "from
collector" to the tank
supply threaded fitting.
4.
¾" copper tube – from
the lower tank outlet
marked "to pump"
to the tank return
threaded fitting.

FUNCTION

Check valves
and
The solar station is equipped with check valves in the supply
and the return ball valve (J, Q).
For filling, venting and flushing of the installation the check
valves must be turned to the correct position. To set the
proper position for the check valves take off the temperature
into
gauges (C, E), remove the top cover (D) and turn the ball
valves into the proper position using a wrench. See Figure
26. In the 45° position the balls in the ball valves push the
,
check valves open.
During operation the ball valves must be in 0° position.
by
Check valve is
operating, flow
only in flow
direction

FLOWMETER

The flowmeter serves to measure and display flow volume
of the system in a range of 0.5-5.0 US gpm.
In order to guarantee the flawless function of the measuring
device the installation must be flushed and free from foreign
substances.
The flowmeter must be mounted vertically.
LEFT SCALE:
0.5 - 3.5 GAL/MIN
READING EDGE =
TOP EDGE OF THE
TURBINE
EXAMPLE:
ABOUT 2 GAL/MIN
23
45°
Check valve is not
Ball valve
operating, flow in
closed,
both directions.
no flow.
Figure 26.
RIGHT SCALE:
4 - 5 GAL/MIN
READING EDGE =
BOTTOM EDGE OF
THE TURBINE
Figure 27.
90°

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srcc og-100

Table of Contents