Nectre Fireplaces 800 Operating Instructions Manual

Wall heater

Advertisement

Installation & Operating Instructions
Nectre 800 Wall Heater
100% Australian Made
Pecan Engineering Pty Ltd
13 Acorn Road
DRY CREEK SA 5094
ph. (08) 8349 8332 Fax. (08) 8260 6643
www.nectre.com email: info@pecan-eng.com.au
Toll Free 1800 636 301
1

Advertisement

Table of Contents
loading

Summary of Contents for Nectre Fireplaces 800

  • Page 1 Installation & Operating Instructions Nectre 800 Wall Heater 100% Australian Made Pecan Engineering Pty Ltd 13 Acorn Road DRY CREEK SA 5094 ph. (08) 8349 8332 Fax. (08) 8260 6643 www.nectre.com email: info@pecan-eng.com.au Toll Free 1800 636 301...
  • Page 2: Table Of Contents

    CONTENTS SAFETY PRECAUTIONS ................3 INSTALLATION CHECKLIST ................4 PARTS SUPPLIED ..................4 INSTALLATION IN DETAIL ................5 NECTRE 800 WALL HEATER – SUGGESTED FRAMING ......9 DOOR GLASS ....................11 DOOR GASKET.....................11 FIREBRICKS ....................12 LIGHTING YOUR FIRE .................12 INITIAL OPERATION PERIOD..............12 GENERAL OPERATION................13 OVERNIGHT BURN ..................13 BAFFLE PLATE LOCATION................14...
  • Page 3: Safety Precautions

    SAFETY PRECAUTIONS This heater must be installed to the specifications and clearances listed on the compliance plate to ensure your safety. Variances from these specifications will void your warranty and could cause a serious house fire. To ensure compliance with the relevant Australian Standards, your heater must be installed with the recommended flue system.
  • Page 4: Installation Information

    Set up for fan to be connected to mains power supply, eg. Install power socket in enclosure, or access for extension cord to fan. PARTS SUPPLIED Nectre 800 Wall Heater (includes facia trim and fan) • 100mm x 1130mm long C-section cross bearers (Qty = 2) •...
  • Page 5: Installation In Detail

    INSTALLATION IN DETAIL The Nectre 800 Wall Heater is designed to be built in to a wall enclosure and may be elevated from the floor. The wall enclosure may be constructed of non combustible material such as masonry or Hebel blocks or may be constructed of timber and steel framing and clad with plaster board and fibre-cement sheet (see drawing).
  • Page 6 Floor Protection Where the floor material is heat sensitive then a floor protector shall extend under and in front of the heater. If the base of the heater is 590mm or more above the floor then the floor • protector must be a minimum of 6mm fibro cement sheet 1metre wide extending under the heater and 300mm in front of the wall.
  • Page 7 Front wall to heater The front wall from floor to ceiling shall be non combustible comprising metal framing (supplied with heater) and cladding material such as Versalux fibro cement sheeting. The minimum side clearance from the heater to any timber framing within the enclosure shall be 165mm (i.e.
  • Page 8 Flue Requirements Install a 150mm diameter double cased flue kit to comply with AS 2918. Fit an additional 300 mm diameter outer casing from the heater to a minimum of 300 mm above the ceiling having bent tabs or spacers to ensure a 25 mm clearance to the flue outer is maintained.
  • Page 9: Nectre 800 Wall Heater - Suggested Framing

    NECTRE 800 WALL HEATER – SUGGESTED FRAMING The diagram on the next page shows a suggested wall enclosure for the Nectre 800 Wall Heater. Assuming a ceiling height of 2400mm, a timber frame has been constructed using 90x35mm timber, 2400mm high, 1200mm wide, and 525mm deep.
  • Page 11: Door Glass

    DOOR HANDLE ADJUSTMENT If leaking occurs the door gasket may be loose. It may be required to adjust the door handle. If this occurs: 1) Wait until heater is cool. 2) Open door. 3) Undo lock nut on handle shaft and remove. 4) Remove locking latch and remove one washer.
  • Page 12: Firebricks

    FIREBRICKS The firebricks are designed to fit in the base and along the rear and side walls of the firebox. Please ensure the bricks are fitted before using the fire. LIGHTING YOUR FIRE 1) Place firelighters and pieces of crumpled newspaper in firebox floor. 2) Cover the paper with small diameter split kindling.
  • Page 13: General Operation

    GENERAL OPERATION Once the heater has been burning on high for approximately 20 to 30 minutes it will have reached operating temperature. You may now slow the burn down by adjusting the air slide into the closed position. Turn the fan on to the preferred speed setting.
  • Page 14: Baffle Plate Location

    BAFFLE PLATE LOCATION To clean your flue system the baffle plate will need to be removed. Before continuing ensure the fire is completely extinguished. 1) Lift baffle up from the rear and slide forward out through the door. You will need to lift the rear lip of the baffle plate over the front and rear mounting rods.
  • Page 15: Fan Service

    FAN SERVICE To provide years of trouble free operation the fan motor bearings are factory lubricated. However, damage can occur if dust or lint builds up in blades. Therefore the fan assembly should be inspected and cleaned each year. 1. Turn off power and disconnect power lead. 2.
  • Page 16: Ten Year Warranty

    TEN YEAR WARRANTY Pecan Engineering Pty Ltd warrants this stove to be able to operate under normal use and service and within ten years from the date of the original purchase on the terms herein shall repair or replace without cost to the original customer any part thereof which shall be returned to our factory, transportation charges prepaid and which our inspection shows would prevent operation.
  • Page 17: Replaceable Components Of The Heater

    800 Series 590mm x 288mm x 8mm 4. Door Rope 800 Series 1900mm x 16 mm Round 5. Glass Rope 800 Series 1840mm x 19mm x 3mm Flat Adhesive back 6. Brick Retainer Brackets 800 Series 2 7. Door Glass...

Table of Contents