Assembly Procedure for Seals

Storage

26
When repairing a tool, the internal
parts must be cleaned and
lubricated. Parker O-lube or
equivalent must be used on all O-
rings. Each O-ring must be coated
with O-lube before assembling.
A small amount of oil must be used on all moving surfaces and
pivots. After reassembling, a few drops of 30W non-detergent oil or
equivalent, must be added through the air line before testing.
The stapler should be stored in a cool dry place.