Loading The Nailer - Campbell Hausfeld IronForce IFN2190 Instruction Manual

Framing nailer
Hide thumbs Also See for IronForce IFN2190:
Table of Contents

Advertisement

Use a pressure regulator on the compressor, with an operating
pressure of 0-125 psi. A pressure regulator is required to control the
operating pressure of the tool between 70 and 120 psi.

Loading the Nailer

1. Always connect the tool to the air supply
before loading fasteners. (fig. 9)
2. Pull nail pusher mechanism back until
pusher engages with magazine latch.
(fig. 10)
Figure 9
Figure 10 - Pusher Mechanism
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ironforce ifn3490

Table of Contents