Buderus Logano plus SB325 Installation And Service Instructions Manual page 36

Floorstanding condensing boiler
Hide thumbs Also See for Logano plus SB325:
Table of Contents

Advertisement

8
Inspection and service
Inspection work
15. Confirm professional commissioning.
Company stamp/signature/date
Tab. 16 Inspection report
Responsive maintenance
1.
Shutting down the heating system.
2.
Clean the combustion chamber.
3.
Clean hot gas flues (heating surfaces).
4.
Check gaskets on combustion chamber door and replace if
required.
Replace the gaskets on the reversing chamber door and on the
cleaning cover of flue gas collector.
5.
Check that the condensate drain pipe is clean and filled with a
hydraulic seal.
6.
Check the neutralising system (where fitted).
7.
Start up the heating system.
8.
Final check of the maintenance work, take measurements and
record values and test results.
9.
Check the safe and proper functioning in operation (safety
equipment).
10. Confirm professional commissioning.
Company stamp/signature/date
Tab. 17 Heating system maintenance report
36
Page (individual steps)
Page (individual steps)
Page 31
Page 32
Page 32
Page 33
See technical documentation of the
neutralising system
Page 28
See technical burner documentation.
Notes
Notes
Logano plus SB325 – 6 720 806 328 (2013/07)

Advertisement

Table of Contents
loading

Table of Contents