Download Print this page

Important Note - Curtis TPC15T Service Manual

Milano twin brewer

Advertisement

Your Curtis ADS System is Factory Pre-Set for Optimum Performance.
After connection to water and power; the rear toggle switch must be on. You will hear a beep sound, indicating power is available to the controller.
The control displays
Water will fill the tank (approximately 2-3 minutes depending on water flow rate). When the proper level is reached
screen. It takes approximately 20 minutes to reach setpoint temperature of 200°F.
Control will display
2
. Press ON/OFF button and the screen will display
when temperature reaches the setpoint (200°F). Unit is now ready to brew.
. After three seconds,

IMPORTANT NOTE:

All programming selections are performed with the three center buttons.
The symbols below the buttons are:
Scroll LEFT
 SELECTION or ENTER to save new parameter
Scroll RIGHT
is displayed.
will appear on the

Advertisement

loading