International comfort products N9MP1 Installation Instructions Manual page 40

90+ single stage fan assisted, direct vent gas furnace
Hide thumbs Also See for N9MP1:
Table of Contents

Advertisement

Subbase for Combustible Floor
NOTE: The three(3) screws in the top panel of the furnace next to
the duct flange MUST be removed to provide serviceability of the
primary heat exchangers in the downflow installation
Note: When using the subbase for combustible floors, the dis-
charge air duct flanges on the furnace MUST be broken down to
provide proper fit up to the subbase. Use duct pliers to bend the
duct flanges flat onto the furnace casing. DO NOT bend the duct
flanges inward (toward the heat exchangers) as air flow restric-
tions may occur.
Table 11
Subbases for Combustible Floors Dimensions
Subbase for Combustible
Floors Part Number
Floors Part Number
Furnace Subbase
NAHH001SB
NAHH002SB
NAHH003SB
NAHH010SB
Subbase for Coil Cabinets
NAHH004SB
NAHH005SB
NAHH006SB
NAHH009SB
*
Outside Dimension
**
Base Spacer Side To Side
3.
Set the base over the opening in the floor, centering it over
the opening. Fasten the base to the floor with screws or
nails. See Figure 46, Figure 47 and Figure 48.
4.
Drop the plenum through the opening in the base. The
flange of the plenum should rest on top of the subbase.
5.
Position furnace or coil cabinet and furnace on subbase so it
aligns between the locating tabs.
Figure 46
Furnace Subbase
T
Plenum
H
K
R
P
L
N
Hole in
Floor
A
40
Subbase for Combustible
Floor Dimensions
H*
J*
K**
11
3
9
15
/
28
/
14
/
16
4
16
5
3
3
19
/
28
/
18
/
16
4
16
5
3
13
22
/
28
/
21
/
16
4
16
3
3
9
24
/
28
/
23
/
4
4
16
11
9
9
15
/
20
/
14
/
16
16
16
5
9
3
19
/
20
/
18
/
16
16
16
9
13
23
20
/
21
/
16
16
11
9
9
24
/
20
/
23
/
16
16
16
S
Combustible
Floor Base
J
M
25--20--46
The Subbase for Combustible Floors MUST be used when a
downflow furnace is set on a combustible floor, even when the fur-
nace is installed on a coil box.
1.
Cut the opening in the floor according to Table 11. The hole
in the floor must be cut to the dimensions listed in Table 11
since the base is equipped with locating tabs that center the
base over the opening.
The opening in the base is 1
the recommended size of the opening in the floor. This is done to
maintain clearance between the floor and the plenum.
2.
Fabricate the plenum to the dimensions given in Table 11.
Note that the dimensions given are outside dimensions.
Opening In Floor
L
M
N
1
5
16
16
/
14
/
4
8
1
1
16
16
/
18
/
4
4
1
7
16
16
/
21
/
4
8
1
1
5
16
/
16
/
23
/
4
4
8
1
1
5
16
/
16
/
14
/
4
4
8
1
1
1
16
/
16
/
18
/
4
4
4
1
1
7
16
/
16
/
21
/
4
4
8
1
5
16
16
/
23
/
4
8
Figure 47
H
K
P
L
N
A
A = 4 1/4" Minimum clearance from back of hole to wall or other obstruction.
1
1
/
² shorter and 1
/
4
8
Opening In Base
Typical Plenum
For Plenum
Dimensions
P
R
S
1
15
13
/
15
2
1
15
17
/
15
8
3
15
19
/
15
4
1
15
22
/
15
2
1
15
13
/
15
2
1
15
17
/
15
8
3
15
19
/
15
4
1
15
22
/
15
2
Coil Cabinet Subbase
S
T
Plenum
Combustible
Floor Base
J
R
M
Hole in
Floor
25--20--46b
² narrower than
T
1
13
/
2
1
17
/
8
3
19
/
4
1
22
/
2
1
13
/
2
1
17
/
8
3
19
/
4
1
22
/
2
440 01 1021 01

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9mp2C9mpdH9mpdT9mpd

Table of Contents