Side Mounted Filter Rack
Figure 42
Filter Installation using Optional Filter Rack
When installing or removing a bottom mounted filter, slide the two
side filter clips to the back of the furnace BEFORE installing or re-
moving. This will allow the filter to clear the front raised edge of the
furnace. Insert filter into side clips first and push filter back until it is
fully engaged into back clip. When filter is in place, slide clips back
into place midway on filter as shown in Figure 43 and Figure 44.
Figure 43
Bottom Mounted Filter Rack
Slide filter clips towards back before removing
Figure 44
Filter Clip Construction
1
1
/
²
2
26 Ga. Galvanized Steel
Refer to Figure 45 and for guidelines to install filters. Furnaces
which require larger filter media and have limited clearances on
one side of furnace, require a standoff filter rack, see Figure 45,
available from your distributor.
440 01 1021 01
25--20--90
25--24--18
1
1
/
²
4
11
/
²
16
Standoff Filter Rack
Figure 45
Using Optional
Standoff Filter
Rack
CAUTION
If filters are only suitable for heating application, advise
homeowner that filter size may need to be increased if air
conditioning is added.
Addition Of Air Conditioning
When a refrigeration coil is used in conjunction with this unit, it
must be installed parallel with or on the discharge side of the unit to
avoid condensation on the heat exchanger. The coil installation in-
structions must be consulted for proper coil location and installa-
tion procedures. With a parallel flow arrangement, dampers must
be installed to prevent chilled air from entering the furnace. If
manually operated dampers are used, they must be equipped with
a means to prevent operation of either unit unless the damper is in
full heat or full cool position.
A 3² clearance is required on the right side of the furnace in order to
run the condensate drain line. Copper, iron or plastic tubing may be
used for the condensate drain line.
Downflow Furnace Installation
Non- Combustible Floor Installation
Fabricate a plenum to the dimensions given in Table 11, for the fur-
nace outlet. Plenum should be flanged, approximately
port.
Note: The three(3) screws in the top panel of the furnace next to
the duct flange MUST be removed to provide serviceability of the
primary heat exchangers in the downflow installation
1.
Position plenum through the floor and set the furnace over
the opening in the floor. If necessary, grout around the base
to seal air leaks between the base and the floor.
Combustible Floor Installation
WARNING
!
FIRE HAZARD
Failure to install unit on noncombustible subbase
could result in death, personal injury and/or
property damage.
Place furnace on noncombustible subbase on
downflow applications, unless installing on non- -
combustible flooring.
25--21--45a
3
/
² for sup-
4
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9mp2C9mpdH9mpdT9mpd

Table of Contents