g
SG Series 10 & 20 kVA
How to access the terminals for the cable connections.
Fig. 3.8.1-1 Access to the input / output connections of SG Series 10 and 20 kVA
To access input, output and Battery connections proceed as follows:
•
Remove protection panel "A".
•
Remove protection panel "B".
•
Remove UPS side panel "C".
•
Only from Separate Input Utility:
Remove with appropriate tool the metallic window "D" from the metal screen "C".
OPM_SGS_ISG_10K_40K_0US_V010.doc
Top entry cables
Bottom entry cables
25/45
A
D
C
B
Installation Guide SG Series 10, 20, 30 & 40 kVA
GE