F. Change vent direction to horizontal/inclined
run - At transition from or to a horizontal/in-
clined run, install the SV4.5E45 and SV4.5E90
elbows in the same manner as the straight vent
sections. The elbows feature a twist section to
allow them to be routed about the center axis
of their initial collar section to align with the
required direction of the next vent run element.
Twist elbow sections in a clockwise direction
only so as to avoid the possiblity of unlocking
any of the previously connected vent sections.
See Figure 23.
4-13/16"
(122 mm)
Swivel Joint
°
(360
swivel)
(360
SV4.5E45
°
(45
Elbow)
Figure 23
G. Continue installation of horizontal/inclined
sections - Continue with the installation of the
straight vent sections in horizontal/inclined run
as described in Step C. Install support straps
every 5' (1.52 m) along horizontal/inclined vent
runs using conventional plumber's tape. It is
very important that the horizontal/inclined
run be maintained in a straight (no dips) and
recommended to be in a slightly elevated
plane, in a direction away from the fireplace
of 1/4" rise per foot (20 mm per meter) which
is ideal, though rise per foot run ratios that are
smaller are acceptable all the way down to at or
near level. Use a carpenter's level to measure
from a constant surface and adjust the support
straps as necessary.
It is important to maintain the required clear-
ances to combustibles: 1" (25 mm) at all sides
for all vertical runs; and 3" (76 mm) at the top,
1" (25 mm) at sides, and 1" (25 mm) at the
bottom for all horizontal/inclined runs.
H. Frame roof opening - Identify location for
vent at the roof. Cut and/or frame opening per
Roof Framing Chart and Figure 24.
16
7-5/8"
(194 mm)
Swivel Joint
°
swivel)
SV4.5E90
°
(90
Elbow)
Figure 24
I. Install the roof flashing - Extend the vent sec-
tions through the roof structure. Install the roof
flashing over the vent section and position such
that the vent column rises vertically (use carpen-
ters level) (Figure 25 ). Nail along perimeter to
secure flashing or adjust roofing to overlap the
flashing edges at top and sides only and trim
where necessary. Seal the top and both sides of
the flashing with waterproof caulking.
Figure 25
J. Install the storm collar - Install the storm
collar, supplied with the flashing, over the
vent/flashing joint. See Figure 26. Loosen the
storm collar screw. Slide collar down until it
meets the top of the flashing. Tighten the ad-
justing screw. Apply non-combustible caulking
or mastic around the circumference of the joint
to provide a water tight seal.
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
C
D
Framing Dimensions for Roof
Pitch
C
D
0/12
10-1/2 in.
10-1/2 in.
(267 mm)
(267 mm)
6/12
10-1/2 in.
12 in.
(267 mm)
(305 mm)
12/12
10-1/2 in.
17-3/4 in.
(267 mm)
(451 mm)
Figure 26
K. Install the vertical termination - The final
step involves installation of the SV4.5CGV-1
Vertical Termination. Extend the vent sections
to the height as shown in the "Vertical vent
termination section" in Figure 4 on page 6. The
SV4.5CGV-1 Vertical Termination (Figure 27 )
installs in the exact same fashion as any other
Secure Vent section. Align the termination
over the end of the previously installed section,
adjusting the radial alignment until the locking
dimples of the termination are aligned with
the inlets of the four incline channels of the
last vent section. Push the termination down
until it fully engages, then twist the termination
clockwise running the dimples down and along
the incline channels until they seat at the end
of the channels.
Figure 27
If the vent system extends more than 5' (1.5
m) above the roof flashing, stabilizers may be
necessary. Additional screws may be used at
section joints for added stability. Guide wires
may be attached to the joint for additional sup-
port on multiple joint configurations.
Storm
Collar