Ariston G.C.N: 47-116-51(24kW) Installation And Servicing Instructions page 50

Gas red condensing wall hung combination boilers
Table of Contents

Advertisement

MAINTENANCE GUIDE
Drain primary and domestic hot water circuits. Remove the two
3.12 CONDENSE TRAP
Tools
1
MAINTENANCE GUIDE: CLAS HE
3.13 SAFETY VALVE
Page. 14 of 24
Tools
1
Drain boiler (see 3.3). Disconnect the
discharge pipe
3.14 BY-PASS ASSEMBLY
50
Tools
screws and remove the heat exchanger
CONDENSE TRAP
SAFETY VALVE
BY-PASS ASSEMBLY
Unscrew the condense trap from the condense
Remove the first clip on the left and
pull the safety valve towards you
Time
body
Time
5 min
Time
5 min
5 min

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents