JVC KD-LH915 Service Manual page 18

Cd/sd receiver
Table of Contents

Advertisement

QQ
3.2.7 Removing the loading arm assembly
3 7 63 1515 0
(See Figs.13 and 14)
• Remove the mechanism control board, top cover, mechanism
section and front unit.
(1) From top side of the mechanism section, move the loading
arm assembly in the direction of the arrow. (See Fig.13)
(2) Release the projections from the right and left joints (m, n)
of the chassis base. (See Figs.13 and 14)
(3) Release the projection from notch p of the connect arm on
the right side of the mechanism section and release the
projection from notch q of the slide cam assembly on the
left side. (See Figs.13 and 14.)
TE
L 13942296513
www
.
1-18 (No.MA156)
http://www.xiaoyu163.com
x
ao
u163
y
i
http://www.xiaoyu163.com
2 9
8
Loading arm assembly
n
Chassis base
Loading arm assembly
Q Q
Side cam
3
6 7
1 3
1 5
assembly
q
n
Chassis base
co
.
9 4
2 8
p
m
Fig.13
0 5
8
2 9
9 4
2 8
m
p
Connect arm
Fig.14
m
9 9
9 9

Advertisement

Table of Contents
loading

Table of Contents