Condensate Drain Configuration

Filter Installation

Field Installed Power Wiring

WC-IOM-7 • Packaged Heat Pump
Installation
Connect properly sized control wiring to the proper termination points
between the zone thermostat and the unit control panel.
An evaporator condensate drain connection is provided on each unit. Refer to
Unit Dimensions
for the appropriate drain location.
A condensate trap must be installed at the unit due to the drain connection being
on the "negative pressure" side of the fan. Install the P-Trap using the guidelines
in
Figure
9.
A condensate drain line must be connected to the P-Trap. Pitch the drain lines at
least 1/2 inch for every 10 feet of horizontal run to assure proper condensate flow.
Do not allow the horizontal run to sag causing a possible double-trap condition
which could result in condensate backup due to "air lock" .
Figure 9.
Condensate Trap Installation
Each unit ships with 2 inch filters installed. The quantity of filters is determined
by unit size. Access to the filters is obtained by removing the indoor fan access
panel.
Refer to the unit Service Facts (shipped with each unit) for filter requirements.
Note: Do not operate the unit without filters.
An overall dimensional layout for the standard field installed wiring entrance into
the unit is illustrated in
wiring is properly sized and installed, follow the guidelines outlined below.
Unit
Dimensions. To insure that the unit's supply power