General Requirements; Related Documents; Location Of Appliance - Biasi Riva Plus HE M296.24SM User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Table of Contents

Advertisement

5

GENERAl REQUIREMENTS

benchmark places responsibilities on
both manufacturers and installers. The
purpose is to ensure that customers are
provided with the correct equipment for
their needs, that it is installed, commis-
sioned and serviced in accordance with
the manufacturer's instructions by com-
petent persons and that it meets the re-
quirements of the appropriate building
Regulations. The benchmark Checklist
can be used to demonstrate compliance
with building Regulations and should be
provided to the customer for future ref-
erence.
Installers are required to carry out in-
stallation, commissioning and servic-
ing work in accordance with the bench-
mark Code of Practice which is available
from the Heating and Hotwater Industry
Council who manage and promote the
Scheme. Visit www.centralheating.co.uk
for more information.
our Company supports the benchmark
initiative. The benchmark Checklist is
located at the back of this manual and
should be completed by the Installing/
Commissioning Engineer and handed
over to the User for future reference by
other visiting Engineers. Also included
is the Service Interval Record card that
should be completed by the Service
Engineer following the annual service
maintenance of the boiler and system.
For Ireland (IE), it is necessary to com-
plete a "Declaration of Conformity" to
GENERAl REQUIREMENTS
indicate compliance to I.S.813.2002.
This appliance must be installed by a
competent person in accordance with
the Gas Safety (installation & Use) Regu-
lations.
5.1

Related documents

The installation of this appliance must be in
accordance with the relevant requirements
of the current Gas Safe (Installation & Use)
Regulations, the Local Building Regula-
tions, the current I.E.E. Wiring Regulations,
the Regulations and by-laws of the local wa-
ter undertaking, and in Scotland, in accord-
ance with the Building Standards (Scotland)
Regulation. Health and safety document n°
635 "Electricity at work regs.".
It should also be in accordance with the Brit-
ish Standard Codes of Practice:
In Ireland (IE). The installation must be
carried out by a Competent Person and in-
stalled in accordance with the current edi-
tion of I.S.813.2002 "Domestic Gas Installa-
tions" the current Building Regulations and
reference should be made to the current
ETCI rules for electrical installations.
5.2

location of appliance

The appliance may be installed in any room
or internal space, although particular atten-
tion is drawn to the requirements of the cur-
rent I.E.E. Wiring Regulations, and in Scot-
land, the electrical provisions of the Building
Regulations applicable in Scotland, with
respect to the installation of the combined
appliance in a room containing a bath or
shower.
For Ireland (IE), reference should be made
to the current edition of I.S.813.2002 and
the current ETCI rules for electrical instal-
- 31 -
- 31 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents