1
Attach plate "F" to the post so it is halfway between the ground and the
top of the gate.
2
Slide Plate "F" into bracket "H" and secure with bolt "E" and nut "G".
3
When the gate is closed, attach plate "B" to the gate at the same height
as plate "F".
4
Gate bracket "B" should be mounted approximately 23-1/4" from the gate
hinge point. The installed bracket must provide a level operation for the
operator.
5
Test the location before welding.
NOTE: When the gate is full open or full close, the unit should not
be at the end of its stroke.