5mm Min
5mm both sides
recommended for
ease of installation
and service.
Fig. 7
450mm Min
For Servicing
Purposes
5mm Min
In Operation
Fig. 8
12
450mm
5mm Min
200mm Min
200mm Min

7.0 Site Requirements

7.1
1. The installation must be carried out by a CORGI
Registered Installer or other registered competent
person and be in accordance with the relevant
requirements of the current G
and Use) R
(Scotland)(Consolidation), the L
R
EGULATIONS
and the bye laws of the L
Where no specific instruction is given reference
should be made to the relevant BRITISH
STANDARD CODES OF PRACTICE. For Ireland
install in accordance with IS 813 "I
G
A
AS
PPLIANCES
7.2
780mm
Standard
BS 6891
BS 5546
BS 5449 Part 1
BS 6798
BS 5440 Part 1
BS 5440 Part 2
BS 7074
BS 7593
WARNING - The addition of anything that may
interfere with the normal operation of the
appliance without the express written permission
of Baxi UK Limited could invalidate the appliance
warranty and infringe the G
and Use) R
7.3
1. A flat vertical area is required for the installation
of the boiler.
2. These dimensions include the necessary
clearances around the boiler for case removal,
spanner access and air movement. Additional
clearances may be required for the passage of
pipes around local obstructions such as joists
running parallel to the front face of the boiler.
7.4
1. Where the appliance is installed in a cupboard or
compartment, no air vents are required as the
appliance runs sufficiently cool.
2. The minimum clearances must be adhered to and
the cupboard or compartment big enough to house
only the boiler and any ancillary equipment.
Information
S
AS
AFETY
, the B
R
EGULATIONS
UILDING
OCAL
, the current I.E.E. W
IRING
W
OCAL
ATER
NSTALLATION OF
".
B.S. Codes of Practice
Scope
Gas Installation.
Installation of hot water supplies for
domestic purposes.
Forced circulation hot water systems.
Installation of gas fired hot water boilers.
Flues.
Ventilation.
Expansion vessels and ancillary
equipment for sealed water systems.
Treatment of water in domestic hot water
central heating systems.
S
AS
AFETY
.
EGULATIONS
Clearances (Figs. 7 & 8)
Ventilation of Compartments
(Installation
EGULATIONS
B
UILDING
R
EGULATIONS
U
.
NDERTAKING
(Installation

Advertisement

Table of Contents
loading

Table of Contents