Checklist - Carrier 58MSA Installation, Start-Up, And Operating Instructions Manual

4-way multipoise fixed-capacity condensing for sizes 040—120 series 110
Table of Contents

Advertisement

5. Turn off 115-v power to furnace.
6. Reconnect inducer motor leads, reinstall main furnace door,
and turn on 115-v power supply.

CHECKLIST

1. Put away tools and instruments. Clean up debris.
2. Verify manual reset switch has continuity.
3. Verify that blower and control access doors are properly
installed.
4. Cycle test furnace with room thermostat.
5. Check operation of accessories per manufacturer's instruc-
tions.
6. Review User's Guide with owner.
7. Leave literature packet near furnace.
39

Advertisement

Table of Contents
loading

Table of Contents