Performing Leak Tests; Placing The Indoor Unit In Position - Samsung AD18A1C09 Owner's Instructions & Installation Manual

Multi-split type room air conditioner (cool and heat)
Hide thumbs Also See for AD18A1C09:
Table of Contents

Advertisement

C
I
OMPLETING THE
NSTALLATION

Performing Leak Tests

C
D
B
A

Placing the Indoor Unit in Position

Installation
plate
42
E-
Before completing the installation (insulation of the cables,
hose and piping and fixing of the indoor unit to the installation plate),
you must check that there are no gas leaks.
To check for gas leaks on the...
Indoor unit
Outdoor unit
Once you have checked that there are no leaks in the system, you can insulate
the piping, hose and cables and place the indoor unit on the installation plate.
1
To avoid condensation problems, place heat-resistant polyethylene foam
separately around each refrigerant pipe in the lower part of the indoor unit.
2
Wind insulating tape around the pipes and drain hose.
3
Place the resulting bundle carefully in the lower part of the indoor unit,
making sure that it does not jut out from the rear of the indoor unit.
4
Hook the indoor unit on to the installation plate and move the unit to the
right and left until you are sure that it is securely in place.
5
Finish wrapping insulating tape around the rest of the piping leading to the
outdoor unit.
6
Using clamps (optionally supplied), attach the piping to the wall wherever
possible.
Then, using a leak detector,
check the...
Flare nuts at the end of sections
C and D.
Valves on sections A and B.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ad26a1c13Ud18a1c2Ud26a1c2

Table of Contents