Read Installation Manual Carefully
Ensure that there is at least 9 feet head of water pressure at the
top of the boiler .
Ensure that ALL dust particles, filings , plastic chips etc. are
removed from the inlet pipe.
If the installation is a replacement the system must be flushed
clean. System should be drained hot, then refilled, then drained
again until the water is clean.
Ensure that there is a proper electrical supply i.e. 230V fused at
3A for the permanent live.
Take great care with pipe connections to ensure that no
damage is done to the internal pipework.
Ensure that the 22mm condensate pipe is not exposed to
freezing conditions.
Make sure that the exhaust pipe terminates away from windows
or vents and is out of reach.
Make sure that the air inlet and exhaust pipe outlets are at least
300mm apart.
Check tightness of all connections in the boiler before firing.
Ensure that the terminals supplied are fitted to both the exhaust
and air inlet pipes.
The system must be free from air before firing.
If TRV's are installed on radiators ensure that a bypass is
installed to maintain required flow.
Complete the Gas Boiler Commissioning Checklist - Service
Interval Record (Chapter 9).
Complete the combustion testing (Section 4.7) using a
calibrated flue gas analyser.
KESTON CONDENSING BOILERS
IMPORTANT
C45, C40P & C55(P)
INSTALLATION KEY POINTS
The Keston C45, C40P, C55 C55P

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C40pC55C55p

Table of Contents