Page 1
William Wilson Ltd., Unit 3A, 780 South Street, Whiteinch, Glasgow G14 0SY Tel: 0141 4341530 Due to continuous improvement and updating, specifications may be altered without prior notice. Heatrae Sadia Service Sales Hurricane Way, Tel: (01603) 420330 Tel: (01603) 420110...
Page 2
SYMPTOM POSSIBLE CAUSE REMEDY Heat Thermal cutout 6. “Low Flow” exchanger A. Cartridge fuse or A. Switch off shower and isolating switch. Renew fuse or Fixing Lugs indicator not lit. miniature circuit reset mcb. If they operate a second time, contact a Printed Circuit Board (PCB) Isolating switch...
SYMPTOM POSSIBLE CAUSE REMEDY CONTENTS 1 TECHNICAL SPECIFICATIONS 1. continued F. continued 4. Release ‘LOW’ and ‘START/STOP’ buttons. 1.1 CONNECTIONS 5. Press ‘START/STOP’, the shower will be reset to Internal components ......p2 previous settings. Inlet connection -15mm ext. diameter Wiring diagram ........
fitted in the pipework to the shower, in an 2 IMPORTANT INFORMATION 9 FAULT FINDING accessible place. This will be of great 2.1 Your shower is designed and tested In the unlikely event of a problem, consult the trouble shooting chart below. benefit if any maintenance work or to the very highest standards and complies complete replacement of the shower is...
MAINTENANCE flow and result in extremely hot water HOW AN INSTANT ELECTRIC being emitted from the spray head. SHOWER WORKS ‘Inspect Handset’ warning A damaged hose could completely block 2.19 When the user starts the shower by 8:4 This light will flash when it is advised the outlet of the shower;...
3 SITING AND PLUMBING Highest Position 3.1 Spend some time planning exactly Indicator lights Stop /Start button USER START where to site the shower heater and riser Riser rail PROTECT STOP and indicator light User protect rail. Bear in mind the height of people who LOW FLOW HIGH Low flow...
3.10 Ensure there are no services such flashing. fitted in the water supply pipe to the The policy of Heatrae Sadia is one of as gas, water pipes, electrical or telephone shower. This is to allow the shower heater 5.56 Hold down the ‘START/STOP’ button...
5.48 The ‘MED’ and ‘LOW’ power settings INSPECT HANDSET LIGHT 4 ELECTRICAL INSTALLATION Double pole isolating switch: allow you to reduce the power used by the 5.52 This product is fitted with an pull cord or wall mounted in accordance WARNING heater and can be used at times of the with IEE regulations...
5.35 Ensure that all three screws hold the COMMISSIONING re-tiling. If you must tile around the 5 CONNECTING TO SERVICES shower backplate to the wall firmly. shower, DO NOT grout right up to the NOTE: The first commissioning of the PREPARATION shower backplate as this makes 5.36 Strip the outer insulation sheath back...
PIPE ENTRY 5.16 Side Entry. You must use a straight shower heater, prior to connecting to connector with an overall length (including the shower - see Fig. 6. It may be best 5.12 Available entry points:- top, bottom, nuts and olives) of less than 42mm. to take the shower off the wall to do this.