Maintenance; Maintenance Schedule; Cleaning The Release Sheet; Conveyor Belts-Removing, Servicing & Replacing - Antunes, AJ Roundup VCT-20 Owner's Manual

Ajantunes vertical contact toaster owner's manual vct-20, vct-25, vct-50
Table of Contents

Advertisement

VERTICAL CONTACT TOASTER
WARNING
Turn the unit off, disconnect the power source
and allow the unit to cool down before performing
any service or maintenance on the unit.

Maintenance Schedule

DAILY
1. Turn off power to the toaster.
2. When the toaster is cool, follow the procedures
under Cleaning the Release Sheet.
3. Remove heat shield and bun chute. Wash in
back sink, sanitize and rinse.
4. Wipe down the outside of the toaster with a
slightly damp cloth and allow to air dry.

Cleaning the Release Sheet

1. Turn the rocker switch to off, unplug the unit and
allow it to cool down.
2. Put on protective gloves. Remove heat shield
and release sheet (Figure 7).
3. Wipe release sheet on both sides with a clean,
sanitized towel.
4. Remove front and rear conveyor cover assys.
(Figure 4). Wipe exterior of conveyor belt with a
clean, sanitized towel.
5. Install front and rear cover assys. (Figure 4) then
turn toaster on. Count to 10, then turn toaster off.
Remove front and rear cover assys. and wipe
new section of belt. Re-install the front and rear
cover assemblies.
6. Install the release sheet by draping it over both
sides of the platen with the crease centered
directly on the platen (Figure 7).
7. Install the heat shield (Figure 7). The heat shield
clips fit over the tip of the platen and retain the
release sheet.
IMPORTANT: Make sure heat shield assy. is activat-
ing (depressing) the conveyor interlock switch (see
Figure 7). The conveyors will not rotate unless the
heat shield is in place and interlock switch is acti-
vated (depressed).
CAUTION
To prevent damage to the unit, do not use abra-
sive cleaners on the release sheet.

MAINTENANCE

Heat Shield
Platen
NOTE: Check the release sheet to make sure it
is not caught in the conveyor. Additional release
sheets can be obtained through your authorized
service agency under part no. 7000110 (3 pack) or
7000111 (10 pack).
Conveyor Belts–Removing, Servicing &
Replacing
REMOVING THE CONVEYOR BELT
1. Turn the rocker switch to off, unplug the unit and
allow it to cool down.
2. Remove the heat shield, front and rear conveyor
covers and release sheet (Figure 4).
NOTE: When replacing conveyor belt, it is recom-
mended that the release sheet cleaning procedures
be performed.
3. Set both compression knobs to: 6 = 7/8" (22.2
mm).
4. Disconnect the conveyor belt by squeezing any
two links together and unhooking both ends of
one link (Figure 8). A needle-nose pliers may be
required. Remove conveyor belt.
NOTE: With conveyor belt removed, the tensioner
assemblies (4, page 24) and slide rails (40, page 24)
can be replaced.
10
Release Sheet
Interlock Switch