Remote Controller Installation - Navien CH-180 Installation Manual

Gas combination water heater / heating boiler
Hide thumbs Also See for CH-180:
Table of Contents

Advertisement

Remote Controller Installation:

Remote Controller NR-10PU
The following are considerations for determining the location of the
remote controller:
Disconnect the power to the combination Water Heater / Heating Boiler
before installing the remote controller.
The wire on the reserve of a remote contoller is connected to the orange wire
on the PCB board which is located on bottom of the combination Water Heater
/ Heating Boiler. The naked wire must be completely insulated after connection.
DO NOT connect 110~120VAC to this remote controller.
The maximum length of wire between the combination Water Heater / Heating
Boiler and the remote controller installation location is limited to a maximum of
300 feet.
There is no polarity.
The remote controller is water resistant but not water proof.
Do not install the remote controller outdoors.
Do not install the remote controller in any area where the controller will be
directly exposed to water, heat, humidity or steam.
Place remote controller out of children's reach.
Do not disassemble the remote controller.
Feed the remote controller wire through the black rubber seal at the
bottom, right hand, back corner of the case.
50

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ch-210Ch-240

Table of Contents