Move Ground To Area
Above In-Wall Evap.

Figure 2-40 Bus Electrical Harness Ground

f
Remove bus grounding screw and relocate to an
area that doesn't interfear with the In-Wall evaporator
(See Figure 2-39 & Figure 2-40).
g
Carefully cut access holes in the bulkhead (rear)
and floor, following the procedures outlined in Section 4,
Hose Routing Procedures.
h
The area where the drain lines are layin is flat. Notch
out a small area so the drain line elbow will be lower than
the flat area, thus allowing any water to drain away
quickly (See Figure 2-41).

Figure 2-41 In-Wall Hose/Drain Line Cut-Out

T--311
Notch-out for
Drain Line Access
2--18

Figure 2-42 In-Wall Hose Cover Back

i
Secure hose backs to bus wall. Route refrigerant
hose, electrical cable and drain lines to the IW
evaporator. Refer to Section 4, Hose Routing
Procedures and Section 5, Electrical
INSTALLATION HINT
Remove the red light immediately behind the
area where the hose and harness is routed.
This will allow you access to the area between
the inside and outside walls making it much
easier to route the refrigerant hose and electri-
cal cable to the evaporator. (See Figure 2-43).

Figure 2-43 Bus Light Removed For Access