Fujitsu Primergy CX270 S2 Operating Manual page 47

Server node
Hide thumbs Also See for Primergy CX270 S2:
Table of Contents

Advertisement

V
CAUTION!
There is a risk that data may be lost.
– BMC
BMC offers several options for switching the server on and off, e.g. via
Server Power Control page of BMC Web interface.
V
CAUTION when turning off the power
(Windows Server 2008)!
The operation of the power switch can be specified as "Do Nothing",
"Stand by", "Hibernate", and "Shutdown" depending on the OS settings.
The default is "Shutdown".
On this server, functions corresponding to "Stand by" and "Hibernate" are
not supported as BIOS and hardware functions.
For details about operating mode settings, refer to the manual supplied
with the OS.
CX270 S2
Operating Manual
Starting up and operation
47

Advertisement

Table of Contents
loading

Table of Contents