Processor Unit - Furuno BR-1000 Installation Manual

Bridge alarm system
Hide thumbs Also See for BR-1000:
Table of Contents

Advertisement

1. HOW TO INSTALL THE EQUIPMENT
1.2

Processor Unit

A maximum of two processor units can be installed, including the optional unit. To in-
stall the no. 2 processor unit, the Ethernet Hub HUB-101 is required. (For additional
information, see the instruction manual (C4200707) for the HUB-101.)
Fasten the processor unit to a bulkhead or the deck as shown below.
1. Make four pilot holes for φ10 coach bolts or four fixing holes for M10 bolts. See the
drawing below for mounting dimensions.
2. Fasten the unit with φ10 coach bolts or M10 bolts. (Supply bolts locally.)
360±1(14.17±0.04)
158(6.22)
2-φ11(0.43)
Fixing Hole
155(6.10)
12(0.47)
Dimensions in millimeters (inches)
360±1(14.17±0.04)
Bulkhead mounting dimensions for the processor unit
1-3