Chassis Installation Brackets - Runco CineWall CW-95DHD User Manual

Full-hd, 2.35:1 in-wall display and digital high definition (dhd) controller/scaler/processor
Table of Contents

Advertisement

To reduce the overall depth of the chassis assembly for shipping, the installation brackets
that secure the chassis and screen to the wall are packaged separately. These brackets
are installed at the customer site right before installing the chassis assembly into the wall
opening:
Side Light
Block, Left
Bottom
Light
Blocks,
Left Side
(2)
Bottom Brackets (4)
Figure 2-1. Chassis Installation Brackets
Bottom Brackets: The bottom brackets support all of the weight of the chassis
assembly, and provide a pivot point while the chassis is "rotated into" the wall opening.
Once installed, these can be screwed into the wall opening with sheet rock screws.
Top Flange: The top flange locks the top of the chassis into position and stops the
rotation of the chassis as it is being installed. An installation tool is provided to set the
exact distance between the bottom brackets and the top flange, as this is a critical
dimension. Shims can be used along the top of the flange if necessary to compensate for
any wall irregularities.
Bottom and Side Light Blocks: Light blocks at the bottom and sides of the screen
complete the chassis-wall-screen interface. These are installed right before installing the
screen, and minimize stray light leakage from behind the screen.
CineWall™ Installer/Integrator Manual
Top Flange
Bottom Light
Blocks, Right
Side (2)
Side Light
Block,
Right
7
System Description
2.3
Chassis Installation
Brackets

Advertisement

Table of Contents
loading

Table of Contents