Amana GUI* Installation Instructions Manual page 9

Gas-fired warm air furnace
Table of Contents

Advertisement

Proper Chimney
Termination?
(Check 1)
Yes
Chimney channel
free of solid and
liquid fuel
appliances?
(Check 2)
Yes
Crown in good
condition
(Check 3)
Yes
Cleanout free of
debris?
(Check 4)
Yes
Liner in good
condition?
(Check 5)
Yes
Dilution air
available?
(Check 6)
Yes
Complete the
installation.
(Check 7)
CHECK 1 - PROPER CHIMNEY TERMINATION.
A masonry chimney used as a vent for gas fired equipment
must extend at least three feet above the highest point
where it passes through the roof. It must extend at least two
feet higher than any portion of a building within a horizontal
distance of 10 feet. In addition, the chimney must terminate
at least 3 feet above any forced air inlet located within 10
feet. The chimney must extend at least five feet above the
highest connected equipment draft hood outlet or flue
collar.
If the chimney does not meet these termination require-
ments, but all other requirements in the checklist can be
met, it may be possible for a mason to extend the chimney.
If this will not be practical, see Fix 1.
Line, terminate with
No
listed vent cap
(Fix 1)
Change venting
No
arrangements
(Fix 2)
Rebuild crown
(Fix 3)
No
and/or Reline
(Fix 4)
Reline
No
(Fix 4)
Reline
No
(Fix 4)
Reline
No
(Fix 4)
10' or Less
2' Min.
Ridge
Termination 10 Feet Or Less From Ridge,
Wall or Parapet
More than 10'
NOTE: No Height
above parapet
required when distance
Wall or
Parapet
from walls or parapet is
more than 10 feet.
More than 10'
Ridge
Termination More Than 10 Feet From
Ridge, Wall or Parapet
9
2' Min.
3' Min.
Wall or
Parapet
Chimney
10' or Less
2' Min.
3' Min.
Chimney
Figure 10
3' Min.
Chimney
Height above any
roof surface within
10 feet horizontally.
10'
2' Min.
3' Min.
Chimney
Figure 11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gci*Gui seriesGci series

Table of Contents