Introduction; Notes On The Documentation; Other Instructions Supplied; Retention Of Documents - Vaillant eco TEC plus 415 Instructions Manual

Wall hung open vent condensing boiler
Table of Contents

Advertisement

1 Introduction

1
Introduction
1.1

Notes on the documentation.

To ensure clarity of information in instructions a
new European standard of advice and symbols is
being introduced. To ensure compliance with this
new standard the following details are included.
The following information is intended to help you
throughout the boilers entire instruction pack.
We assume no liability for any damage caused by
non-observance of these instructions.
1.1.1
Other instructions supplied with this
appliance.
For the owner:
Instructions for use no. 0020020829
Short operating instructions no. 838404
Warranty card with return envelope no. 802922
For the installer/service engineer:
Flue installation instructions no. 834449
The instructions for any accessories and controllers
used also apply.
The Benchmark gas boiler commissioning checklist
(in the installation manual) should be completed by the
installer and/or the commissioning engineer.
If, after reading these instructions, you have any
questions on the operation of the boiler, please contact
either your installer or Vaillant Technical Department.
1.1.2

Retention of documents

Please retain this literature and all related documents
so that they are available whenever they are required.
If you move please pass on the documents to the
buyer.
1.1.3

Safety instructions and symbols

Please observe the safety instructions in this literature
for the operation of the appliance.
Danger!
Immediate risk of serious injury or death!
Danger!
Risk of death from electric shock!
Danger!
Risk of burns or scalding!
Caution!
Potentially dangerous situations for the
product and environment.
Note!
Useful information and instructions.
•Symbol for a necessary task
Note!
This boiler must be installed and serviced by a
competent person in accordance with the Gas
Safety (Installation and Use) Regulations 1998.
In the UK 'CORGI' registered installers
undertake the work in compliance with safe
and satisfactory standard.
4
Supplied by HeatingSpares247.com
1.2

ecoTEC plus boilers

The ecoTEC plus boilers are designed to provide
central heating from a fully pumped open-vented
or sealed water system. The central heating water
temperature can be adjusted on the boiler.
The domestic hot water can only be adjusted on the
boiler if it is installed with a Vaillant uniSTOR unvented
cylinder and relevant controls. Once the controls
are set the boiler operates automatically. A frost
protection programme is also included.
Please read these instructions and follow them
carefully for the correct and economical use of your
boiler.
These instructions are applicable to the following
ecoTEC plus boilers, available in Natural Gas.
All ecoTEC plus boilers can be converted to LPG.
APPLIANCE
ecoTEC plus 415
ecoTEC plus 418
ecoTEC plus 428
ecoTEC plus 438
1.3

General notes

The boiler has been designed for use with a open-
vented central heating system, and comes fully
tested and assembled. The boiler is easily mounted
on any internal wall and can be installed with either a
horizontal or vertical RSF (room sealed fan assisted)
flue. The boiler uses a standard flue system (100 mm
or 125 mm outside diameter). Flue extensions and
additional bends and elbows are available for the
flue system to increase the flexibility. If desired, an
inhibitor may be used in the system. Guidance on the
use of inhibitors is contained in these instructions.
The boiler has a built in diagnostic system which
indicates the operational status of the boiler. This
feature provides key information to aid commissioning
and fault finding. The data badge is fitted to the
combustion chamber cover of the boiler. See text of
General Requirements for installation requirements or
notes.
The Valliant ecoTEC plus boilers have been
constructed in accordance with recognised safety
regulations. Nevertheless, danger to the life and
limb of the user or third parties can still occur or the
appliance or other material assets be damaged in the
event of improper use. The appliances are designed for
central heating systems. Any other use or extended
use is considered to be use other than intended. The
manufacturer/supplier is not liable for any resulting
damage. Intended use includes the observance of the
operating and installation manual and the adherence
to the inspection and maintenance conditions.
Caution!
Any incorrect use is forbidden.
The appliances must be installed by a competent
person, who is responsible for adhering to the existing
regulations, rules and guidelines.
MAXIMUM OUTPUT
15kW
18kW
28kW
38kW
Installation and Servicing ecoTEC plus

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eco tec plus 418Eco tec plus 428Eco tec plus 438

Table of Contents