Procedure 2 Debugging Port Check - Toshiba TECRA M11 Series Maintenance Manual

Hide thumbs Also See for TECRA M11 Series:
Table of Contents

Advertisement

2.4.2 Procedure 2 Debugging Port Check

Check the D port status by a debug port test. The tool for debug port test is shown below.
1. Not a Serial Port model should connect a debug port test cable to connector CN3110 of
a system board.
2. Connect the RS-232C Cross-cable to the PC that displays the test results.
4. Boot the computer in MS-DOS mode.
5. Execute GETDPORT.COM in the text menu in CPU REAL mode. (Insert the FD for
starting D port into FDD and input "FD starting drive:>dport".)
The D port status is displayed in the following form;
6. When the D port status is FFFFh (normal status), go to Procedure 4.
7. When the D port status falls into any status in Table 2-4, execute Check 1.
TECRA M11/Satellite Pro S500M Series Maintenance Manual (960-813) [CONFIDENTIAL]
Figure 2-1 A set of tool for debug port test
Troubleshooting Procedures
2-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Satellite pro s500m series

Table of Contents