Wiring Diagram - Viessmann VITOROND 100 Installation And Service Instructions Manual

Oil-fired boiler heating input 91 to 140 mbh 27 to 41 kw
Table of Contents

Advertisement

Wiring Diagram

(Vitorond 100 with Beckett burner)
WARNING
Electric shock hazard. Can cause
severe personal injury or loss of life if
power source, including service
switch on boiler, is not disconnected
before installing or servicing.
All field supplied nominal 120 VAC voltage wiring must be sheathed in a flexible metal conduit.
"
Disconnect means, overload protection and low water cut-off must be provided as required by local codes.
"
Connect incoming line voltage HOT (L1) wire to terminal L1, and N to terminal L2 of the Honeywell high limit control (see
"
wiring diagram below).
POWER SUPPLY. PROVIDE DISCONNECT MEANS
AND OVERLOAD PROTECTION AS REQUIRED.
CONTROL CASE MUST BE CONNECTED TO EARTH
GROUND. USE GROUNDING SCREW PROVIDED.
B1 IS 1/4 IN. TAB TERMINAL.
WM0-1
BLOCKED VENT SAFETY SWITCH 120VAC
Female 3-pole
plug
Male 3-pole
Burner disconnect
Burner disconnect
Burner harness
120 VAC field wiring
24 VAC field wiring
120 VAC factory wiring
Low voltage factory wiring
Legend
Oil solenoid valve
Ignition transformer
Burner motor
CAD cell flame detector
Burner grounding screw
R7184 Series primary control (post
purge feature of the R7184 primary
control not used in this application)
Factory-installed jumper
Installations must follow these codes
and requirements:
- National Electric Code, ANSI/NFPA
70, latest edition and any additional
national, state or local codes.
- In Canada, CSA C22.1 Canadian
Electrical Code Part 1 and any local
codes.
Additional temperature
limit control (when
required by local
jurisdiction)
plug
L1
Honeywell limit
control harness
Burner junction box
BK
Black
BL
Blue
GRN Green
OG
Orange
RD
Red
VT
Violet
WH
White
YE
Yellow
- Wiring must be N.E.C. Class 1. If
original wire as supplied with boiler
must be replaced, type 105°C wire or
equivalent must be used. Supply
wiring to boiler and additional control
wiring must be 14 ga. or heavier.
- Provide electrical ground at boiler as
required by codes.
N
Circulator
RD
BK
WH
VT
BL
OG
YE
YE
Burner primary control
CAUTION
A field supplied manual reset high
limit control must be installed at the
outlet pipe of the boiler to interrupt
burner operation should the factory
supplied high limit control fail. This
field supplied high limit control must
be set 20°F above the setting of the
factory supplied high limit control.
The setting of this field supplied high
limit control must never be greater
than 220°F.
Burner
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitorond 100 vr1 series

Table of Contents