Viessmann VITOROND 100 Installation And Service Instructions Manual page 17

Oil-fired boiler heating input 91 to 140 mbh 27 to 41 kw
Table of Contents

Advertisement

Venting Connection
Ø ½" / 10 mm
(continued)
IMPORTANT
When installing piping or venting, or
while insulating overhead pipes, do not
stand on top panel of boiler. Advise
other trades accordingly!
Legend
Vitorond boiler with burner
Outside rain cap
Vent, use approved vent material
M-Barometric damper
(field supplied) for oil
Vent pipe adaptor (factory supplied)
For Canada:
Blocked vent safety switch
*1
Install in accordance with the draft
control manufacturer's instructions.
Installation Instructions
Blocked Vent Safety Switch
Installation
Use approved vent material only.
1. Install the venting so as to achieve
the shortest possible way with
minimum elbows. If necessary,
rearrange existing water piping to
achieve closest chimney connection.
2. Horizontal runs must be supported by
appropriate means to prevent
sagging. Avoid long horizontal runs of
vent pipe. Horizontal runs should
have not less than ¼" rise per ft.
*1
from the boiler to the vent terminal.
Metal strapping must be used to
support horizontal runs every 4 ft.
3. Connect factory supplied vent pipe
adaptor
using either three equally spaced,
corrosion resistant, self-tapping
screws and high temperature
silicone, or equivalent means.
4. Connect chimney via a 18" / 457 mm
long field supplied, slightly inclined
intermediate section of venting. Flue
pipe outside ∅: 5".
5. Drill a ½" opening on the side of the
vent pipe approximately three times
the vent pipe diameter away from the
flue gas collar of the boiler for flue
gas analysis equipment.
6. Seal all flue pipe joints.
7. Viessmann recommends that any
non-insulated vent pipe is insulated
to reduce cooling of flue gas and
velocity noises.
Connections
to flue gas collar. Fasten
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitorond 100 vr1 series

Table of Contents