Andrew 3.7-Meter Earth Station Antenna Installation And Operation Manual page 26

Andrew corporation 3.7-meter earth station antenna installation, operation and maintenance
Table of Contents

Advertisement

An illustration of the final azimuth tiller arm is shown in Figure 3-12.
Figure 3-12: Azimuth Tiller Arm - Final Assembly
Step 5
Locate the elevation and azimuth struts (P/N 202951-2-manual) as shown in Figure 3-13.
NOTE: The azimuth strut is the strut on the right and the elevation strut is on the left.
Figure 3-13: Elevation and Azimuth Struts
Installation Procedures
26